You are now leaving the City of College Station websiteloading

Roadway re-striping set for Sept. 23-30

Last item for navigation
Roadway work could cause traffic delays starting Thursday
Posted on 09/22/2021
A City of College Station contractor will apply pavement and intersection markings along several major corridors starting Thursday. The work is expected to take about a week.

The corridors being restriped will include Brewster Drive from WS Phillips Parkway to William D. Fitch Parkway; Lakeway Drive from Fitch to Agate Drive; Rock Prairie Road from Harris Drive to Fitch; Dominik Drive from Texas Avenue to Puryear Drive; George Bush Drive East from Texas to Holleman Drive; Holik Street from Anna Street to Bush; Tarrow Street from University Drive to Lincoln Avenue; and Longmire Drive from Rock Prairie to Deacon Drive.

Traffic could be affected at times in these areas, and motorists are advised to drive with caution.

-30-
City of College Station | All Rights Reserved | Powered by CivicLive | © 2024 Civiclive.